From:                              route@monster.com

Sent:                               Friday, August 19, 2016 10:53 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Jose Aguirre 

Last updated:  08/15/16

Job Title:  no specified

Company:  Apeiron, Inc.

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


El Paso, TX  79912
US

Mobile: 915-282-5670   
Home:
915-630-6747
joeelpaso@aol.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Jose Aguirre - Project Scheduler

Resume Value: 3bzzjzk8tnxbgnd9   

  

 

Jose Aguirre

1521 Rosenbaum Ln.

El Paso, Texas 79912

Phone: 915-301-3737

joeelpaso@aol.com

 

 

WORK EXPERIENCE:

 

Ultimate Concrete El Paso, TX

Project Scheduler June 2015 to July 2016

·            Created bid, baselines, & update schedule Using Primavera P6 version 8.4

·            Created CPM baseline schedule; created the WBS, activities, activity codes, & logic

·            Worked with subcontractor and vendors to verify activity durations & timeframe for long lead items

·            Cost loaded project schedules and created pay applications

·            Created accruals to estimate monthly earning at end of each month

·            Performed Earned value analysis

·            Tracked project cost and progress on the monthly narrative report

·            Attended monthly schedule update meetings to review updated cost, schedule logic changes, correction of out of sequence work, and production rates

·            Uploaded schedule information into QCS/RMS for USACE projects

·            Performed QCS/RMS support to include creating Prompt Payment Certifications, track stored materials, submittals, and running reports

·            Analyzed claim data to include verification of dates, time, production rates, equipment usage, costs, and impacts to the project schedule

 

Tradeco InfrastructureEl Paso, TX

Sr. Scheduling Manager February 2015 to June 2015

·            Scheduled demolition, concrete/asphalt paving, bridge construction, & all Utilities

·            Created CPM baseline schedule using Primavera P6 version 8.4; created WBS structure, added work activities, activity coding, & schedule logic

·            Cost loaded CPM schedule and developed Cost Curves (S-Curves) for monthly projections

·            Supported 4 heavy civil TXDOT projects located in Houston & Beaumont, Texas

 

McCarthyFt. Bliss, TX

Project Scheduler August 2014 to February 2015

·            Reviewed and revised the CPM schedule logic on a 13,500 activity schedule

·            Scheduled vertical construction as well as infrastructure work

·            Created 2 week & 180 day look ahead for use with subcontractor and USACE weekly meetings

·            Created & submitted pay applications, submittal tracking sheets, material logs, and invoice backups

·            Attended meetings with subcontractor and USACE to discuss schedule and logic adjustments

·            Uploaded schedule into QCS/RMS to create the Prompt Payment Certification

·            Developed work flows and analyzed schedule data

·            Created Fragnets using Primavera P6 using the reflection function and merged the reflection schedule into master schedule after USACE approval of contract modifications

·            Provided training and support to Project Managers, Project Engineer on using Primavera P6 to include saving layouts, filters, adding and deleting activities, & logic adjustments

 

 

Sundt Construction El Paso, TX & Phoenix, AZ

Scheduling Engineer/Project Engineer   February 2012 to August 2014

·            Worked as a scheduling Engineer scheduling in the Heavy Civil Division scheduling demolition, utility installation, Electrical Substations, roadway widening, Bridge paving, PCCP, Rail installation, & Rail Stations

·            Developed the Primavera P6 CPM master schedule from plans and specification, subcontractor’s schedules, and 3rd party utility providers work schedules

·            Created the WBS codes, activity codes, activity id’s, activity descriptions, and added all items specified in the Project Contract specifications

·            Verified field quantities from 3rd party utility providers, subcontractors, and self-performed work and updated the actual start dates, finish dates, remaining durations, and activity percent complete

·            Cost loaded the Primavera (P6) Schedule and used it as a Schedule of Values to create the monthly pay application submitted to the owner

·            Attended meetings to determine the status of submittals, procurement of long lead items, right of way acquisitions, and traffic control constraints

·            Attended cost review meetings to compare actual weekly cost with earned value

·            Ran and analyzed S-Curves from Primavera (P6) & MS-Excel to compare actual monthly cost with monthly projected cost (early and late curve)

·            Calculated all reimbursable cost, construction fee, and home office overhead to bill to the owner

·            Submitted monthly Schedule update using Primavera (P6)

 

Jacobs Engineering Group/USACE Fort Bliss, TX

Project Controls Scheduler May 2008 to February 2012

·               Reviewed and analyzed over 400 CPM baseline/update schedules to include HQ, COF, TEMF, DFAC, Physical Fitness Center, Child Development Centers, Landscape & Infrastructure, POV & GOV parking, UEPH, MP/Fire Station, Water Booster Pump Station, and medical facilities

·               Analyzed Contractor’s Network Analysis System (NAS) schedules in Primavera Project Planner (P3) and Primavera Project Manager (P6) and recommend acceptance/rejection

·               Assisted Contractors in importing the schedule (SDEF files) into QCS/RMS

·               Imported Primavera (P3) schedules into Primavera Project Manager (P6)

·               Created reports with Primavera (P3/P6) and MS-Excel Spreadsheets to determine cost percent complete by project, phase, area, responsibility, and WBS

·               Created earning reports to determine the cost percent complete

·               Analyzed contract modification using Fragnets, RFI’s, claim digger, & Digger 3.0

·               Update the Primavera (P6) master schedule

 

STC ConstructorsEl Paso, TX

Quality Control Manager/Scheduler December 2007 to May 2008

·               Created CPM schedules for the Centralized Vehicle Wash Facility and the Air Support Operations Squadron in Ft. Bliss, Texas using Primavera (P3)

·               Submitted daily Quality Control Reports to the United States Army Corps of Engineers

·               Worked with the USACE Quality Control System software (QCS) to import the Project Schedule, Quality Control Reports, submittals, and pay applications

·               Estimated concrete work, dry and wet utilities, and earthwork

·               Verified all submittals & shop drawings before submitting to (USACE)

·               Ensured that materials for the job were delivered on time and met the Buy American Act

·               Compared actual material and budgeted hours to the master budget

·               Reviewed bid packages from subcontracts and vendors before awarding contracts

·               Developed field progress photos and daily logs of actual work progress

 

Baker ConcreteAvondale, AZ

Project Engineer October 2007 to November 2007

·   Estimated concrete SOG, spread/strip footings, tilt wall panels, piers, sidewalks, masonry footings, stamped concrete, CIP walls, material quotes, and request for information (RFI’s)

·   Submitted concrete mix designs, shop drawings, and Reinforcing steel specifications

·   Modified the estimate to match the actual material, budgeted hours, and profit

·   Reviewed subcontracts and bid packages to submit to clients and vendors

·   Assisted in the creation of purchase orders and material buyouts

·   Updated the schedule using MS-Project

 

Agave Environmental Contracting Glendale, AZ

Project Manager   August 2006 to September 2007

·   Reviewed contracts, schedules, bids, submittals, and as-builts

·   Estimated irrigation system, plants, boulders, and concrete for change orders

·   Compared actual material pricing to estimate and performed material buyouts

·   Created project job books with budgets, contracts, bluestakes, and purchase orders

·   Processed RFI’s, permits, invoices, purchase orders, and change orders

·   Attended weekly production meetings with Superintendent to review schedules and field operations

·   Attended weekly owner’s meeting to discuss status of RFI’s, submittals, and schedule updates

·   Reviewed cost using Timberline Software to compare actual cost verses budgeted cost per bid item and identified cost overruns and problem areas

 

StoneCrafters of Arizona Phoenix, AZ

Estimator December 2005 to August 2006

·   Estimated stone veneer from Plans/Blue prints using a ruler and digitizer

·   Entered data into MS-Excel Spreadsheet to find material, labor, and profit totals

·   Reviewed Scope of work, Contract documents, and design specifications

·   Submitted bid documentation and proposals to clients

·   Worked with MS-Access database to query material prices & inventory levels

 

Electronic Data Systems El Paso, TX

Information AssociateJanuary 2005 to November 2005

·   Developed C code and UNIX scripts in a Sun Solaris/Oracle 9i environment to create reports and load data, & to transfer data from client’s Database to backup Database

·   Created SQL and PL/SQL statements in Oracle 9i

·   Created unit test plans, implemented designs into production, and verified code

·   Environment: Sun Solaris, Oracle 9i, & UNIX operating system

 

AG Construction El Paso, TX

Project Engineer January 1991 to November 2004

·   Worked on various projects ranging from new construction to remodeling

·   Tracked cost and compared budgeted quantities, actual quantities and cost

·   Conducted field supervision to include laborers, sub-contractors, and vendors

·   Scheduled materials orders and deliveries

·   Approved invoices from vendors and subcontractors

·   Entered material, labor hours, and cost into MS-Access and Excel spreadsheet

·   Administered RFI’s, change orders, permits, shop drawings, submittals, and as-builts

 

EDUCATION:

 

University of Texas at El PasoEl Paso, Texas

Bachelor of Business Administration               December 2003

Computer Information Systems

 

Certification: Primavera (P3) 601, 602 & 603 Houston, Texas

Innovative Management Solutions January 2008

 

 

Certification: Primavera Project Manager (P6)Ft. Bliss, Texas

Innovative Management Solutions November 2010

 

Certificate: 30 Hour OSHATempe, Arizona

Sundt ConstructionSeptember 2013

 

 

SKILLS & ABILITIES

 

·   Strong computer skills with Microsoft Office (Excel, Word, PowerPoint, Access, Outlook)

·   Experience with JD Edwards & Prolog

·   Expert in Primavera P3, Primavera P6, & Microsoft Project

·   Certifications: Primavera (P3) 601-Planning and Scheduling, Advanced Courses 602 & 603

·   Certifications: Primavera Project Manager (P6)

·   Certificate: Critical Path Method I & II, 30 Hour OSHA

·   Member: Project Management Institute (PMI), AACE, & CMAA

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project Scheduler

Ulimate Concrete

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Active Confidential

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Project Scheduler

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Building Construction/Skilled Trades

·         General/Other: Construction/Skilled Trades

·         Site Superintendent

 

Target Locations:

Selected Locations:

US-TX-El Paso

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent

Spanish

Fluent